London Overground Rail Operations

Community images

London Overground Rail Operations

> Show product information

80% positive

1 reviews from the community

Sorry, we couldn't find any offers

Review of "London Overground Rail Operations"

published 21/06/2010 | BNibbles
Member since : 08/10/2000
Reviews : 609
Members who trust : 174
About me :
"Sorry but our editorial and strategic line may lead us to refuse products for which no single merchant sends us offers" . How about "We don't have a link to it, so we don't want your product suggestion?
Super
Pro New trains, better integration into existing ticketing system. New routes and more on the way
Cons All trains stop at ALL stations - no limited stoppers. Very cold air-con!
exceptional
Value for Money
Sightseeing
Shopping
Nightlife
Ease of getting around

"Wombling Free on the 'Underground' Overground"

Unofficial Overground Map!

Unofficial Overground Map!

Just what is this sudden appearance of a London Overground? Is it new?

Is it even over ground? After all, The Underground doesn't even stay underground all the time, so by the same perverse logic, it's to be expected that anything called The Overground will probably go underground sometimes, which it does.

The Overground isn't new but it's more of a pulling together of a mish-mash of tributaries to the London rail network, some of it "requisitioned" from previous main-line services, like the North London Line (NLL) from Richmond to Stratford, which I have to say was getting pretty shabby both to look at and to experience, and some it a re-birth of withdrawn Underground services like the East London Line (ELL) from Shoreditch to New Cross, passing under the Thames in Brunel's famous tunnel - the first underwater tunnel in the world, and still being useful! As with the Docklands Light Railway, a company called LOROL (London Overground Rail Operations Limited) is contracted to run these services on behalf of Transport for London. In addition, the resurrected ELL now runs its trains over links that traditionally have the been the domain of 'main line' companies through to West Croydon, crossing south London to do so.

From now on these routes will have the same 'corporate logo' treatment, in this case the familiar Underground red roundel only more orange and obviously the word 'Overground' not 'Underground' on them. The other attribute they have in common is that they tend mainly to skirt round central London, rather than run in and out of it.

If the use of the phrase 'corporate logo' sounds cynical, it isn't supposed to be. Rather than just 're-badging' the same tired old knackered rolling stock with a few vinyl stickers (a common trick in this wonderful age of rail privatisation), with only one notable exception, all the trains are new and dual-voltage electric*, sporting their new blue and white livery, with orange doors from day one. The exception I spoke of is the Gospel Oak to Barking shuttle service and even here, new matching diesels are to be introduced almost as I write.

(* leaving them free to use either the third rail predominant in central and south London, and the overhead wires strung along long sections of the North London Line.)

As the proud (if you can be proud and labelled an old git at the same time) holder of a Freedom Pass, valid in London on rail services as well as buses, and having a spare day when the sun shone all the time, I decided to ride as much of the Overground as time would permit.

FIRST IMPRESSIONS - THE TRAINS

Having got off a super-smooth-riding South West Trains suburban unit at Clapham Junction, I was pleasantly surprised to find that all the new electric Overground units are equally smooth-riding, being air-sprung. They are only three cars in length compared to the more usual configuration of four and even eight. (Dec 2010 - now being upgraded to four-car units piecemeal) However, they do seem to be very roomy, and there's no wasted space or constriction for the corridor connections. You can see right down the full length of the train and even stand in the end vestibules which are nearly full width. Of course, the reason why there seems to be a lot of floor space is because there's bugger-all seating, it being limited to lateral (back to windows) benches only, which is very reminiscent of current day Underground practice.

Some of these seats fold up when not in use to accommodate wheelchairs. 'Priority seating' for those 'less able to stand*' is finished in a different colour upholstery. Did I say 'upholstery? More like a cloth covering really are there's no discernable padding except that which 'you carry with you'.

Hand-rails are colour-coded to the line's corporate livery of orange

(*Does this include drunks I wonder?)

Being a sunny day, the air-conditioning was turned down to 'nipple-up-perking' levels, and I found myself standing deliberately by a door-way to get some sun on my goose-pimpled arms! The number of girls with their arms crossed bore silent and stiff-lipped witness to this; in fact the whole thing was like looking at a Les Dawson impersonator's convention.

Information displays are good, showing final destination and next station alternately, combined with frequent digitised announcements, which given the number of stops on this line, mercifully do not keep reminding us to take our belongings with us, although helpfully, do tell us about possible interchange opportunities!

Being largely above ground, sometimes on embankments and viaducts, mobile phone reception is pretty good including being able to use the internet on a 3G phone. Of course, you do have to know when the next tunnel's coming.......

Acceleration is good and seamless for something built to 'main line' standards - best to hang on if not seated.

FIRST IMPRESSIONS - STATIONS

What an introduction to a brand-spanking new service Clapham Junction is - not! What a dead-and-alive hole. Fortunately my train to Willesden Junction obliged by pulling in, waiting 10 minutes and getting the hell out of there with me in it! Stations all along this route alternate from the downright dingy to the 'work in progress but going to look smart one day'. Somehow, re-branding the station just by giving it a new name sticker in orange doesn't convince in the same way that spending a few quid on wheelchair access and a new concourse does.

Travelling from Clapham to Willesden does indeed highlight the 'differences' Firstly, there's dingy old Clapham which could only be improved by pretending it's not there whilst they rebuild it, crossing over the river on Chelsea (Railway) Bridge past the old Lot's Road Power Station, we arrive at brand new Imperial Wharf, serving all the posh high-rises that surround it. Station like Olympia aren't too bad having had a facelift sometime late in the last century, and then you also have the new Shepherd's Bush (For Westfield - Europe's largest mall).

Some stations only have the bare beginnings of redevelopment.

Arriving at Willesden Junction (High Level platforms) is a case in point. The island platform is currently being lengthened (for 6-8 car trains hopefully) and it has been titivated in general. However, if it wasn't for the weather, it could easily have been a nasty windy and wet spot to stand exposed 50 feet up to a north wind.

Changing trains here by waiting on the same platform for a Stratford train emanating from Richmond was easy enough and the trains are pretty frequent, say every 15 minutes off-peak. Displays are informative, showing as many 'next' trains as will fit on the list, bearing in mind that there are also downstairs platforms on the Euston-Watford branch as well as tube platforms.

I can't imagine anyone, other than claustrophobics, wanting to travel all the way from Richmond to Stratford 'overground' as the train stops with almost the same frequency as some buses, when you could hurtle up to Waterloo in about 15 minutes and catch the Jubilee Line from there. All Overground trains are 'all-stations' jobs.

All around the erstwhile North London Line (NLL), evidence of infrastructure improvement is obvious. Tracks are being re-instated to quadrupled status in places (the NLL carries a surprising amount of freight too), junctions that they were so keen to rip out donkey's years ago, like at Dalston are now being put back (very significant and I'll touch on future growth later) and as for Stratford, well, it's virtually unrecognisable from when I was there 5 years back.

Let me see now, there's the new International Station with its passing Eurostars and Kent Javelins all in excess of the 'ton', there's a terminus for the new NLL trains, and the Docklands Light Railway (DLR). The Jubilee Line ends here too, whilst the Central Line stops here as do suburban services from London to Southend and indeed most trains to East Anglia pass through as well. They're even building what appears to be yet another spur to the DLR right through the heart of the station. Then of course, there's the Olympic Stadium in the background.

If it's new you're after, look no further than Dalston Junction on the newly re-opened ELL, currently an unsignposted walk from Dalston Kingsland on the NLL. This really is new, and had been in use for a few weeks, and even more amazingly, it seems I managed to travel all the way to West Croydon from here only days after the full end-to-end service had been running. I wondered why I was outnumbered by staff on the platforms, all milling around and fussing over me to make sure I knew where I was going.

This East London Line (ELL) carries on due south to the river, through a brand-new Shoreditch High St and revamped Wapping and Rotherhithe stations (previously Underground). Emerging on the south side of Brunel's fine tunnel, the line splits to terminate almost immediately at New Cross, having first passed through its Jubilee Line interchange at Canada Wharf. The other branch launches off into south London, passing through the likes of Brockley, Forest Hill and around the Sydenham area to terminate at either Crystal Palace or West Croydon, which is where my day on the Overground ended, walking through the streets of Croydon to find a tram going the right way, i.e. towards Wimbledon. The one way system used by the trams negates finding one outside West Croydon Station that isn't going south-east.

Oh yes, I did also ride the Gospel Oak-Barking line just for the hell of it too. Riding through London in what appears to be a provincial diesel Sprinter didn't somehow seem quite right.

Bits I missed? I didn't ride the Richmond to Willesden Junction section of the NLL, nor did I touch upon the Euston to Watford service, which is practically stand-alone, apart from a platform interchange at Willesden Junction.

After taking the Croydon Tramlink service to womble off to Wimbledon, it was a quick flit up the main line back to Clapham to finish off my circumnavigation of London involving lots of trains and about 500 yards of walking.

FUTURE DEVELOPMENTS

I spoke earlier of the pedestrian link (such as it is with no signage!) between Dalston Kingsland on the NLL, and Dalston Junction, northern terminus of the ELL. Work is already going on to allow for northbound ELL trains to turn left and west onto the NLL, terminating at the four-track Highbury and Islington station but also allowing West Croydon to Clapham trains to run 270 degrees the long way around London if it was thought necessary. This is starting to look like a kind of 'Outer Circle' line. One stop short of West Croydon, at Norwood Junction they are also working to re-instate direct access to Clapham Junction, and once this is done, the Outer Circle becomes a reality, or at least the track will exist. As you may have guessed, calling it 'Outer Circle' is a no-no. Oh no, we have to call it 'The Orbirail Project'!

Whether anyone wants a high-density commuter train with hardly any (and hard) seating to become what is practially a long distance one with journey times longer than London-Brighton, is anyone's guess. It would certainly only be the fools like me doing it for the hell of it that would ride the entire 360 degrees! The major question is whether continuously circling trains would generate enough short distance hop-on, hop-off passenger demand to keep the trains well-patronised. It works for the Circle Line, but that's somewhat nearer the centre of town. Who knows, it could even become a 'victim of its own success' like the M25!

All of this is scheduled to happen in 2012. In view of minor irritations like Emergency Budgets, watch this space.

At the end of all this, 30% of Londoners will be within a 15 minutes walk of an Overground Station but then in many cases they probably already were, it just didn't have the orange sticker over its original name - but heh, what do I care, I'm one of the 70%?

FARES, ROUTES AND JOURNEY TIMES

Now that ALL of London's stations have come on board with the Oyster card system, the last being those run by South West Trains, ticketing is very straightforward. The entire Overground rests within the London zones, most of it conveniently within Zones 1-4 with the possible exception of the Watford line ending in a zone marked 'here be dragons', Watford having the pure cheek not to be even in London!.

Euston -Watford. End to end timing is 52 minutes with a frequency of 20 approx. minutes (However, there are faster ways of going directly between the two)

Richmond - Stratford. End to end timing is a stonking great 62 minutes with a frequency of about 15 minutes. Yet again, there are faster ways.

Clapham - Willesden - Stratford. The shorter run takes about 25 minutes with an up and down frequency anywhere between 8 minutes and 30! Some Clapham-based trains carry on to Stratford, increasing the frequency of Willesden to Stratford trains to about 8 minutes once mixed in with what originates at Richmond.

Dalston Junction to West Croydon. End to end 53 minutes - just you try getting from north-east to south-west London in less! Running about every 10 minutes.

OVERALL

Nice new nipple-teasing trains with possibly over-zealous air-conditioning.

There's loads of floor space at the expense of seats, which are bum-numbing anyway.

Lots of useful transport interchanges along the route.

Same fare structure as the rest of London, with convenient Oyster card system.

There's a higher degree of wheelchair access with more to come.

Overground opens up new travel possibilities, with more to come.

ADDENDUM: WHAT YOU'D HAVE GOT FOR YOUR £7.50

Local bus to Hounslow

SWT Train from Hounslow to Claham Junction

Overground Train from Clapham Junction to Willesden Junction

Overground Train from Willesden Junction to Stratford

Central Line Tube from Stratford to Mile End

District Line tube from Mile End to Barking (Mad)

Overground train from Barking to Gospel Oak

Overground train from Gospel Oak back to Dalston Kingsland

Get lost but eventually find.....

Overground train from Dalston Junction to West Croydon

Amble 500 yards through shopping streets

Tram from central Croydon to Wimbledon

SW Train from Wimbledon to Clapham Junction

SW Train from Clapham Junction to Hounslow

Local bus home.


Phew, I need a beer, this anorak stuff is exhausting!

Community evaluation

This review was read 3581 times and was rated at
73% :
> How to understand evaluation of this review
exceptional

Comments on this review

  • hayleigh_18 published 12/08/2010
    It sounds great but I'm not down that neck of the woods much! I shall return to rate a very impressive review!
  • tallulahbang published 29/06/2010
    Crikey, you really *were* up the junction, weren't you? xx
  • paulpry118 published 24/06/2010
    I sometimes wished I still lived down there, this would suit me fine travelling about checking out where my ancestors came from, however I doubt much of the East End that I would remember would be there now as is it now called Docklands
  • Did you find this review interesting? Do you have any questions? Sign into your Ciao account to leave the author a comment. Log in

Product Information : London Overground Rail Operations

Manufacturer's product description

Ciao

Listed on Ciao since: 19/06/2010